FRN:
1999043199
Funding Year:
2019
470#:
557840001249052
471#:
191026222
Category of Service:
INTERNAL CONNECTIONS
Status:
Funded
FCDL Date:
2019-08-29
Wave:
19
FCDL Comment:
MR1:The funding request amount was reduced from $3,650,441.87 to $3,557,782.06 to remove the amount that exceeded the Category Two budget set for the following entities: 36573 – FOREST HILLS ELEMENTARY SCHOOL, 36569 - WESTCHESTER ELEMENTARY SCHOOL, 37138 – Westwood Heights Elem School, 37168 – Nova Eisenhower Elem, 37188 – Tropical Elementary School, 36579 Coconut Creek Elem School, 37422 Deerfield Beach High School, 36380 Hollywood Hills Elem School, 207874 Lakeside Elementary, and 36595 - Markham Elem School||MR2:The Recipients of Service, 36579 - Coconut Creek Elem School, for all FRN Line Items was removed from to agree with the applicant response.||MR3:The Model and Other Manufacturer Name for FRN Line Item .002 was modified from Other Outlet to Outlet includes cable Superior Essex, CAT6 CMP #66-240-7B, Ortronics CAT6 jack #OR-TJ600, Ortronics faceplate #OR-40300546, Ortronics blanks #OR-42100002 to agree with the applicant documentation.||MR4:The Model and Other Manufacturer Name for FRN Line Item .003 was modified from Other Biscuit Box to Biscuit Box #OR-404TJ2 Ortronics Surface Mount Box to agree with the applicant documentation.||MR5:The Model and Other Manufacturer Name for FRN Line Item .004 was modified from Other Sleeves to STI Firestop 1" Sleeves #FS100 to agree with the applicant documentation.||MR6:The Model and Other Manufacturer Name for FRN Line Item .005 was modified from Other J-Hooks to J Hooks #CAT 32HP Caddy J Hooks to agree with the applicant documentation.||MR7:The Model and Other Manufacturer Name for FRN Line Item .006 was modified from Other Lightning Protection to Lightning Protection #604-75110 Circa CAT6 to agree with the applicant documentation.||MR8:The Model and Other Manufacturer Name for FRN Line Item .007 was modified from Other Nuts, Bolts, Fasteners, Straps to Misc. Nuts, Bolts, Fasteners Straps Velcro fasteners #18645 Dottie 1/4 x 20 x 1/2" screws #RMC1412 to agree with the applicant documentation.||MR9:The Model and Other Manufacturer Name for FRN Line Item .008 was modified from Other Ethernet Extender to Ethernet Extender Veracity PoE Extender #VOR-ORM to agree with the applicant documentation.||MR10:The Model and Other Manufacturer Name for FRN Line Item .009 was modified from Other Conduit Average Distance to PVC3, 3EMT, 3GALV to agree with the applicant documentation.||MR11:The Model and Other Manufacturer Name for FRN Line Item .010 was modified from Other Conduit Long Distance to Conduit Long Distance PVC3, 3EMT, 3GALV to agree with the applicant documentation.||MR12:The Model and Other Manufacturer Name for FRN Line Item .011 was modified from Other Conduit Extended Distance to Extended Distance PVC2, EMT2, 2GALV Extended Conduit to agree with the applicant documentation.||MR13:The Model and Other Manufacturer Name for FRN Line Item .012 was modified from Extended Conduit 24 Port Patch Panel PVC2, EMT2, 2GALV to Ortronics CAT6 24 Port Patch Panel #OR-PHD66U24 to agree with the applicant documentation.||MR14:The Product Type for FRN Line Item .013 was modified from Cabling to Installation, Activation, & Initial Configuration to agree with the applicant documentation.||MR15:The Model Name for FRN Line Item .013 was modified from As- Built , Drawing, Permitting to As-Built is a CAD drawing/map of a school & Permitting is a permit from our in house Building Department to approve the work to be done. to agree with the applicant documentation.
Service Start Date (471):
2020-06-08
Service Start Date (486):
2020-06-08
Committed Amount:
$2,846,225.65
Last Date of Service:
2020-12-28
Disbursed Amount:
$2,474,927.49
Payment Mode:
SPI
Remaining:
$371,298.16
Last Date to Invoice:
2022-01-28

Original
Committed
Monthly Cost:
$0.00
$0.00
Ineligible Monthly Cost:
$0.00
$0.00
Months of Service:
12
1
Annual Recurring Charges:
$0.00
$0.00
One Time Cost:
$3,650,441.87
$3,557,782.06
One Time Ineligible Cost:
$0.00
$3,557,782.06
Total Cost:
$3,650,441.87
$3,557,782.06
Discount Percent:
80
80
Requested Amount:
$2,920,353.50
$2,846,225.65